PROJECT CASE STUDIES

Real Projects.
Lasting Impact.

For over 45 years, RAL Consulting has completed environmental assessments, property condition assessments, and construction progress inspections on properties ranging from single-family residences to multi-million-square-foot industrial campuses.

Physical Assessments

Lockheed Martin plant building in Goodyear, Arizona

Lockheed-Martin Plant

Goodyear, Arizona. This project encompassed 1.6 million square feet of space across 92 buildings on 168 acres of land. The site assessment included an onsite electrical substation, a potable water plant, a self-contained fire sprinkler system, and a wastewater treatment plant. Project completion time: 4.5 weeks.

Aerial view of industrial park buildings

MFD & Company, Houston

Houston, Texas. This project involved the inspection of eight different industrial parks comprising 48 buildings, totaling 1.4 million square feet of space. Project completion time: 2.5 weeks.

Three-story apartment complex with mature trees

MFD & Company, Phoenix

Phoenix, Arizona. This inspection covered three apartment complexes with a total of 74 three-story apartment buildings, 1,180 apartment units, and associated garages. Project completion time: 3 weeks.

Environmental Assessments

Gas station fuel canopy and pumps

National/Alamo Car Rental

Phoenix, Arizona. This project involved the excavation and removal of five underground fuel and oil storage tanks, soil sampling, and subsequent clean-up of contaminated soil.

Excavator digging and moving soil at a remediation site

American Metals

 Phoenix/Mesa, Arizona.  Scope of services included soil assessment for contaminants, excavation, stabilization of contaminants, and removal and disposal of contaminated soil across two sites.

Estrella Mountain desert landscape with saguaro cactus

Estrella Mountain Ranch / Newland Companies

Phoenix, Goodyear, Buckeye, Arizona. RAL performed approximately 50 Phase I Environmental Assessments on properties ranging from 1 acre to more than 20,000 acres per site.

Excavator demolishing a multi-story building

Pacific Realty Advisors

Phoenix, Arizona. Phase I Environmental Assessment of the Motorola semiconductor plant in Mesa, with subsequent follow-up consulting on the demolition of the site.

Construction Progress Inspection Reports

Animal hospital building exterior with parking lot

Chaparral Animal Hospital

Cave Creek, Arizona. Ground-up construction oversight on a $3.3 million development.

Luxury single-family residence at dusk

Single-Family Residence – Silverleaf Subdivision

Scottsdale, Arizona. Ground-up construction oversight on a $7.7 million residence.

Golf course fairway and pond with mountains behind

Papago Golf Course Renovation

Phoenix, Arizona. Renovation oversight of an 18-hole golf course, including tree removal, pond redevelopment, re-sloping of fairways, and new greens, tee boxes, and hazards. A $5.7 million project.

Two engineers in safety vests reviewing site plans in the field

Frequently Asked Questions

RAL has handled projects ranging from single-family residences to multi-million-square-foot industrial campuses, such as a 1.6-million-square-foot, 92-building assessment in Goodyear, Arizona.

Yes. RAL has completed projects in other states, including an eight-industrial-park inspection in Houston, Texas.

Yes, including construction progress inspection oversight on an 18-hole golf course renovation in Phoenix and Phase I Environmental Site Assessments on multiple courses in Arizona.

RAL has provided construction progress inspection on ground-up commercial and residential builds, including a $3.3 million animal hospital in Cave Creek and a $7.7 million residence in Scottsdale, as well as an 18-hole golf course renovation in Phoenix.

Yes. For Estrella Mountain Ranch and Newland Companies, RAL performed approximately 50 Phase I Environmental Assessments on properties ranging from 1 acre to more than 20,000 acres.